New construction RIVM and CBG (on former lot Wentgebouw)

Artists impression nieuwbouw RIVM Utrecht

On the lot of the former F.A.F.C. Went building, the new building of the Ministry of Health, the National Institute for Public Health and the Environment (in Dutch RIVM) and the Medicines Evaluation Board (MEB) is realized. The Wentgebouw is durable demolished by Utrecht University (UU). 

The construction of the new housing for] the RIVM, and MEB started in the week of 4 September 2017. The construction period takes 4 years. In 2021 the new building will be taken into use. More information on www.wegtotdewetenschap.nl (in Dutch).