Utrecht University is to renovate the buildings at Drift 21, 23 and 25. The work includes maintenance and significant improvements to the buildings, including improvements to the indoor climate, accessibility and sustainability. During the works, the buildings will be closed. Other locations will be sought for teaching and offices.
Work in Drift 21
In Drift 21, new climate control installations and the electrics, lighting, data and AV installation will be replaced. The toilet groups will be expanded and a disabled toilet will be installed on the ground floor. The first floor will be made accessible for people with physical disabilities. There will be more meeting and community formation space at the new entrance near the lecture hall. The exterior and interior of the building will be completely painted, the windows will be fitted with vacuum glazing and the roofs and facades will be insulated wherever possible.
Work at Drift 23 and 25
Maintenance at Drift 23 and 25 consists of interior and exterior painting. Replacing the flooring in the teaching rooms and replacing all AV facilities. The air conditioning will also be maintained and adjustments made to improve air quality. Furthermore, top cooling will be installed which will provide more comfort in the building.
The buildings are also being made more sustainable. All fluorescent lighting will be replaced by LED lighting. This new LED lighting will be presence-controlled, and the light strength will be automatically adjusted to the light coming from outside. The brightness will also remain manually adjustable. The single-glazing will be replaced by vacuum glazing, and the windows will be fitted with new heat-resistant blinds on the inside. New motors that consume much less energy than the old motors will be installed in the air treatment system.
Planning
During the works, Drift 21, 23 and 25 will be closed.
- Drift 23 is closed as of today and available again as of September 2024.
- From semester two of academic year 24/25, Drift 21 and 23 will be closed.
- Drift 25 will be under renovation from February to August 2026 and will be available again from the start of college year 26/27.
- Parts of Drift 23 are available again from the start of college year 25/26.
- Drift 21 cannot be reopened until September 2026 at the earliest.